A new bridge was installed over the River Alt between Maghull and Old Roan in the mid 70's. These photos record the action.
A Plasser amp; Theurer tamper track alignment machine no. DD 73 2 74 sits on the southbound track.
If my research is correct this unit still exists and is described as a Universal Tamper/Liner on the South Devon Railway.